The Engineering Tech Building at Eastland-Fairfield Career Center is a 43,000-square-foot facility focused on welding, aviation and pre-engineering programs.

Challenges

Claypool Electric was the subcontractor responsible for the combined electric and technology work in the $10.3 million facility. The project was hampered by weather-related delays after a large section of a concrete masonry wall was destroyed during a strong storm.

Outcome

The completed facility offers 30 welding booths and approximately a dozen computerized numerical control (CNC) machines and flight simulators.

Highlights

  • The project included 10,300 man-hours.

43K

square-foot facility

10.3K

man-hours

30

welding booths

Michael D. Eisner Center for the Performing Arts, Denison University
Canal Winchester High School Remodel and Addition
Engineering Tech Building, Eastland-Fairfield Career Center
Michael D. Eisner Center for the Performing Arts, Denison University-1
Canal Winchester High School Remodel and Addition-1
Engineering Tech Building, Eastland-Fairfield Career Center-1