

Groveport Madison High School
Location: Groveport, Ohio
Project Type: Voice/Data
Contract: $1,500,000
Role: Low-Voltage Technology Contractor
General Contractor: Smoot Construction
Completion: 2018
Complete installation of all low-voltage systems inside a 260,000-square-foot new high school building.
Challenges
This project included installation of multiple systems in this new-build high school facility. Multiple interconnected systems were installed and integrated over the course of the two-year project. Multiple early delays compressed the schedule and limited durations for the installation scope. Due to the complexity of the systems integration, our team had to work with the school system on multiple trainings to ensure staff had adequate knowledge to operate them.
Outcome
Claypool Electric teams were able to complete the construction on time and within budget. Claypool Electric staff worked closely to ensure the high school staff was adequately trained to operate each system. Groveport Madison High School was rewarded with drastically increased security, access control, sound and theater resources.
Highlights
- Integrated Access Control, Cameras and Security System
- Classroom Sound and Video
- Central Sound and Video
- Network Cabling
- Telephone System and Cabling
- Integrated Theater Audio and Lighting System
1.5M
contract
260K
square-foot building
COMPLEX
systems integration









