Fairfield Medical Center Fiber and Data Closet Relocation-v2

Fairfield Medical Center Fiber and Data Closet Relocation

Location: Lancaster, Ohio
Project Type: Voice/Data
Contract: $315,000
Role: Electric Subcontractor
General Contractor: Claypool Electric
Completion: 2021

This project included relocation of network backbone infrastructure through a newly established main equipment room and the establishment of three new technology closets in a working hospital.

Challenges

Relocation of 16 12-strand and 12 24-strand multi-mode fiber optic cables and the establishment of three new TRs in an existing working hospital environment. Fiber relocation and change overs had to be managed off-hours and efficiently to reduce downtime and operational interruptions.

Outcome

The hospital was completed on time with limited downtime and outages. After the relocation, the hospital had a much more stable and manageable system.

Highlights

  • Relocation of multiple backbone cables.
  • New main first-floor technology closet
  • New cardiac cath lab closet with associated fiber connection.
  • New oncology radiology closet with associated fiber connection.
  • Rework and relocation of over 2,000 network drops in three TRs.
  • Removal of over 30,000 ft. of old and unused data cables.

2K+

network drops relocated

30K feet

of cables removed

minimal

downtime