Genesis Coshocton Medical Center-v2

Genesis Coshocton Medical Center

Location: Columbus, Ohio
Project Type: Healthcare
Contract: $4,020,000
Role: Design-Assist Electric Subcontractor
General Contractor: Danis
Completion: 2022

Claypool Electric was selected to be the design-assist electrical subcontractor for this new 60,000-square-foot hospital.

Challenges

Danis led, and Claypool Electric contributed to, a total value management (TVM) process to identify cost over-runs and opportunities for savings through the design completion. During a period of extreme supply chain disruptions, Claypool Electric was able to source materials without detrimental impact to the overall project.

Outcome

Claypool Electric has played an integral role in the successful BIM coordination effort despite challenging above-ceiling installations.

Highlights

Claypool Electric proposed several cost savings ideas that reduced the impact of material escalation including:

  • Simplified power distribution scheme
  • Alternate lighting layouts and manufacturers
  • Reduction in branch circuitry, surface raceway and wiring devices
  • Reduction in low-voltage rough-in costs — both in-wall and above-ceiling

$4M

contract

60K

square-foot facility

CHALLENGING

above-ceiling installations

Ohio State Outpatient Care New Albany, Wexner Medical Center
Fairfield Medical Center, River Valley Campus
Fairfield Medical Center, Project Bright
Ohio State Outpatient Care New Albany, Wexner Medical Center-1
Fairfield Medical Center, River Valley Campus-1