Rickenbacker Cold Storage Facility-v2

Rickenbacker Cold Storage Facility

Location: Columbus, Ohio
Project Type: Design/Build
Contract: $825,000
Role: Design-Build Electrical Contractor
General Contractor: Contegra
Completion: 2022

Developed by Crawford Hoying, the 171,000-square-foot cold storage facility provides a crucial link in the regional logistics infrastructure. The facility uses a state-of-the-art refrigeration system with onboard power monitoring for energy efficiency. Claypool Electric provided the design-build expertise for the electrical service entrance to pre-packed electrical and refrigeration equipment.

Challenges

This project consisted of approximately 135,000 square feet of freezer space at roughly -11 degrees along with a 36,000-square-foot cold dock area that must be maintained to 32 degrees and contains 29 truck docks for loading/unloading of frozen goods. The cold environment had unique LED aisle lighting and power requirements.

Outcome

Underground electrical and overhead rough-in activities in the 55’ areas of the ceilings was performed over the fall of 2021. Construction of the facility was delayed over the winter due to weather. This project was completed in July, 2022.

171K

square-foot facility

UNIQUE

temperature requirements

29

truck docks