Denison University Solar Array
LocationGranville, Ohio Contract$800,000 RoleDesign-Build Electrical Subcontractor Construction ManagerThird Sun Solar Completion2017
In support of Denison University’s goal of increased sustainability, Claypool Electric
partnered with Third Sun Solar to design and construct a 2.3-megawatt photovoltaic solar facility for AEP Energy.
The project scope included the installation of 6,750 panels, 75 inverters, 1.5 miles of underground duct bank, and a 15KV tie in with associated distribution equipment,
transformers, and metering.
OUTCOME
Denison University currently receives 15% of its energy from solar energy, and they have reduced their carbon footprint by 10%. This continues to be the largest solar array at the University.